120M 4-Legged Angle Steel Telecom Tower Trial Assembly before Hot-dip Galvanization
The following images show the trial assembly site of the 120m 4-legged angle steel tower before hot-dip galvanizing. On-site, we checked all material specifications against the drawings and customer requirements to ensure they were all up to standard. Furthermore, based on the design flaws revealed during the trial assembly, we will work with the customer to communicate and negotiate solutions to ensure that the product's performance and appearance are both up to standard.






